Summary
The guidance consists of 5 parts:
- policy and management
- design and installation
- operational management
- validation and verification (including storage/drying cabinets)
- testing methods
Published 20 March 2013. Last updated 30 June 2016.
Related content
Link

(HTM 02-01) NHS estates guidance for medical gas pipeline systems
NHS England is not responsible for content on external websites.
Link

(HTM 04-01) Safe water in healthcare premises
NHS England is not responsible for content on external websites.
Link

(HTM 01-01) Decontamination of surgical instruments
NHS England is not responsible for content on external websites.
Link

Top 10 tips on endoscope decontamination
NHS England is not responsible for content on external websites.
Collection
Link

Decontamination Health Technical Memoranda
NHS England is not responsible for content on external websites.
Link

Health technical memoranda
NHS England is not responsible for content on external websites.